Capital Southeast Connector Documents Archive

Connector logo, modified

The list below contains links to documents of significance to the progress of Connector business, including documents from several different agencies. These are a strong basis for observing that:
Particularly significant source documents are flagged in the left column.

High
Signif-
icance
DateSourceDocumentNotes
5/??/2002SACOGRegional Priority Projects  2002/2003Apparently precedes origin of Connector project
»10/4/2002SACOGMemo from Martin Tuttle, SACOG Executive Director, to Interested Agencies and Persons:
DRAFT AMENDMENT 1 TO THE METROPOLITAN TRANSPORTATION PLAN (MTP) FOR 2025 ...
Near origin of Connector, from SACOG MTP:

First reference to Connector project in currently web-visible documents
3/8/2003SACOGModel Update Report:
Sacramento Regional Travel Demand Model Version 2001 (SACMET 01)
Details of mathematical theory and tooling to forecast regional traffic demand
»12/5/2003SACOGMeeting materials and presentation to Policy Advisory Committee:
Elk Grove-Rancho Cordova-El Dorado Connector Study
First web-visible plan for Connector route; includes demographic summaries severely understating EDH population and growth rate.
»2/5/2004SACOGMeeting materials and presentation to Stakeholders Advisory Committee:
Elk Grove-Rancho Cordova-El Dorado Connector Study
Second version of 12/5/2003 presentation. 2 of 3 maps fail to even identify El Dorado Hills; one illustrates traffic flow from the east emanating from Placerville.
3/10/2004SACOGMeeting Summary, Stakeholders Advisory CommitteeMinor updates to Statement of Purpose and Need
3/30/2004SACOGIntroduction to Small Group Exercise,
Stakeholder Advisory Committee
Studying route alignment
»8/26/2004SACOGAction noted in 11/4/2004 PAC document, reporting minutes of 8/26/2004 meeting of Policy Advisory CommitteeOn 8/26/2004 the Policy Advisory Committee "directed staff to present the Draft Concept Plan to each participating agency to get official endorsement of the Draft Concept Plan and input on preferred alternatives."
»8/31/2004DKS Associates, for SACOGDRAFT Elk Grove-Rancho Cordova-El Dorado Connector Concept PlanFirst web-visible draft of Concept Plan, including alternative alignments in Sacramento County
»10/7/2004EDCTCMinutes for Regular Meeting of El Dorado County Transportation Commission

Meeting materials:
    Staff Report
    Attachments:  1   2   3   4
EDCTC endorsed the Connector Study Concept Plan, deferred consideration of alternatives on Segment 6 (EDH) until review by BOS. EDCTC decision was made in the 10/7/2004 Regular Meeting.
»11/3/2004City of Elk GroveAgenda for Regular Meeting of the City CouncilAgenda item 5.8 was to support the Alternative 3 alignment and endorse environmental evaluation of each alternative. All alternatives were in Sacramento County.
»11/4/2004SACOGPolicy Advisory Committee meeting materialsPAC received endorsements of the Concept Plan, began preparation for environmental studies. Materials include the endorsement memo from EDCTC.
12/13/2004City of Elk GroveNotes from Question & Answer Session
»2/24/2005SACOGPolicy Advisory Committee meeting materialsMeeting includes approval of updated Concept Plan; Concept Plan document is in meeting materials
»3/10/2005SACOGPolicy Advisory Committee meeting minutesPAC approved Concept Plan still without attention to El Dorado Hills and consequent alignment needs in eastern Sacramento County.

"Director Miklos stated we need to get the Concept Plan approved to keep moving."
3/10/2005SACOGSACOG board meeting materialsResolution 11-2005 to adopt Concept Plan on agenda for SACOG Board meeting on 3/17. No action occurred due to lack of quorum.
4/7/2005EDCTCExecutive Director's report to EDCTC boardReport noted PAC approval of Concept Plan.
»5/12/2005SACOGMeeting materials for SACOG Board of Directors meeting on 5/19/2005Resolution 17-2005 to adopt Concept Plan and full copy of Concept Plan were included for agenda item 21.
»5/19/2005SACOGFinal Concept PlanFinal Concept Plan published
»6/9/29005SACOGMinutes of 5/19/2005 meeting of SACOG Board of DirectorsSACOG Board approved the Concept Plan. Resolution 17-2005 was adopted by majority vote, 5 directors opposed.
»7/18/2005Paul RavelingPersonal first contact with SACOG, by emailExpressed general support and high concern about traffic congestion issues on White Rock Road.
7/21/2005SACOGSACOG reply to emailReply by Aimee Hagen
9/28/2005SACOGRFP for Environmental Phase 1 studiesRFP defines scope of work for Alternatives analysis and project definition.
One objective: "Define a reasonable range of alternatives at a sufficient level of detail to support further
analysis, environmental and engineering studies."
Screening criteria include a fatal flaw analysis and travel demand forecasting.
The Conceptual Engineering task referst to the Alternatives cited in the Final Concept Plan while stating that the study may include "any other viable/practical
“alternative” (or combination of features that may not be identified in the Final Concept Plan)".
9/29/2005SACOGMinutes of joint meeting of Policy Advisory Committee and Strategic Planning Committee, 9/2/2005Discussed assignment of project governance to a JPA.
"Director Cooper expressed the need to expedite the process, and a JPA may be the best
option."
12/29/2005SACOGPolicy Advisory Committee,
meeting materials
Progress report on Environmental Phase 1 Studies; includes Task 8, "Prepare Alternatives evaluation and Final Report". Basically, driving this task to completion prior to ability to consider alternatives other than the four then under consideration.
12/29/2005SACOG;
Miller, Owen & Trost
Policy Advisory Committee, meeting materialsIncludes 12/1/2005 memo to Technical Advisory Committee on governance and process issues.
2/14/2006SACOGDraft Purpose and Need StatementIncludes related content.
»3/3/2006SACOGPolicy Advisory Committee  meeting materialsAgenda includes Draft Statement of Purpose and Need, Draft Functional Guidelines, and Public Outreach.
The public outreach strategy "will focus on the purpose and goals of the current phase of the Connector Project. She [Ms Hoyt] explained that the public outreach will focus on information dissemination and education of the public on the project and the current process.". Four meetings were planned, one each in Rancho Cordova, Folsom, El Dorado Hills, and Sheldon. Note absence of input from the public to SACOG in the public outreach process.
6/XX/2006SACOGFrequently Asked Questions documentOne relevant question & answer:
Q: "Will there be an opportunity to study other alignments not identified in the Concept Plan?"
A: "At the start of the formal environmental review process, there will be an opportunity during the scoping process to suggest new alternatives were not included in the Concept Plan. To be considered, new alternatives will need to address the Purpose and Need of the project."
»6/21/2006DKS Associates for URS CorporationDraft Travel Demand Analysis Technical ReportComparison of housing unit estimates for EDH with EDH Fire Depf. statistictics, using sum of SACOG sub-RAD 851 & 852 estimates...
SACOG area may be slightly smaller than EDH Fire District.

2005 --    SACOG: 10,210       Fire Dept:  13,215
2032  --   SACOG: 25,054       Fire Dept:  28,350*
    * FD 2032 estimate projected from 2005 conditions
       using 5-year history to derive growth rate
6/26/2006SACOGPresentation for Public Information SessionsSessions scheduled 6/26, 6/27, and 6/29
6/29/2006SACOGPublic comments from community outreachComments include those I submitted on behalf of the El Dorado Hills Citizens Alliance. These include noting need for an alternative alignment on the south side of El Dorado Hills.
»7/19/2006SACOGTechnical Advisory Committee meeting minutes"Mr. [James] Labanowski [URS Corporation] stated that the conceptual designs are complete."

Note that the formal environmental review process had not yet been started. Therefore either this is a false milestone or the JPA's process management precludes the promised ability to 'suggest new alternatives ... not included in the Concept Plan'.
9/1/2006SACOGPolicy Advisory Committee meeting materialsSame notes as for 7/19/2006 TAC meeting with additional content mainly regarding funding.
»11/16/2006SACOGEnvironmental Phase 1 Studies
Final Technical Report
Includes Project Conceptual Design, with alternatives for Sacramento County, without alteratives for EDH area.
6/19/2007Connector JPAProject briefing to SACOG Goods Movement Advisory Group
»4/3/2009Connector JPADraft Purpose and Need statement, "clean-1" version
4/3/2009Connector JPADraft Purpose and Need statement, "clean-3" version
4/29/2009Connector JPAPresentation for EDH Community WorkshopConnector map still shows only the major alternatives in Sacramento County, still no alternative for the EDH area.

Project Timeline shows Technical Studies complete in April, 2010..
6/8/2009Connector JPAPresentation for EDH Community Workshop #2Estimates of growth in housing units appear more consistent with Fire District statistics than in prior documents.

Forecast traffic at county line in 2045 is ~36,000 ADT for Draft "High" Connector Concept, ~23,000 ADT for No Build.

Expected % of traffic on White Rock between Latrobe Rd & US 50 and on US 50 east of Silva Valley appears far too low.

Presentation includes 2 slides showing alternative alignments suggested by the EDH Citizens Alliance.
»10/5/2009EDC BOSLegislative File Nmber 09-1189County DOT reccomendations:
-- Support Connector JPA
-- Pursue individual grants for Connector-supportive projects
-- Work with Connector JPA & El Dorado/Folsom JPA to include alternatives other than White Rock Road
-- Work with Connector JPA to receive credit for EDC CIP projects
»1/4/2010DKS AssociatesMemo on 2035 Traffic Demand in El Dorado HillsProblems with traffic estimates are most extreme at White Rock Road & US 50/Silva Valley Pkwy:
Estimate for Existing traffic is 1,900 ADT, DOT traffic count for 2008 is 9,248.    Discrepancy is a factor of 4.9,  7,348 ADT.
Estimate for 2035 is 11,400 - 15,100 ADT, DOT estimate for 2025 is 44,600.  Discrepancy is greater than a factor of 2.2 to 3.9 -- 26,300 to 30,000 ADT. (Note comparison of JPA 2035 statistics to DOT 2025 statistics.)
1/4/2010DKS Associates2035 Daily Traffic Volume PlotIn EDH area, with Connector, White Rock Rd alignment only
2/17/2010Connector JPAProject Description plus Purpose and Need, "clean-6" draftApparently final
»2/XX/2010Connector JPANotice of Preparation, Program EIRNOP notes ONLY Sacramento County alternative alignments
»4/1/2010EDC DOTPresentation on 2010 West Slope CIPIncludes estimates of 2025 traffic levels.
5/11/2010Connector JPAPresentation to EDC BOSMaps still show no alternative to White Rock Road for carrying regional traffic. Two maps suggest possible local connectors to Connector, which could partially mitigate impacts from traffic originating or terminating in EDH. This mitigation is independent from regional traffic requirements.
5/11/2010Connector JPAUpdate to EDC BOSUpdate notes direction from BOS to County staff on 10/5/2009 for 7 action items. Item v is "Work with the Southeast Connector JPA and the El Dorado County/City of Folsom JPA to include alternatives that terminate at points other than just White Rock Rd/Silva Valley Interchange".

Status presented in this update with regard to all items is:

"DOT and the Capital SouthEast Connector JPA* staff are working together on this project."

No details were reported.
»5/21/2010Connector JPAJPA Board PacketIncludes memo from Maggie Townsley (ICF International) on screening and selection of a preferred alternative. Only the Sacramento County alternatives are considered.
»6/XX/2010Connector JPAJune 2010 Fact SheetMap still shows only Sacramento County alternatives
»6/XX/2010Connector JPARFQ/P for Financial Advisory ServicesEntire document still refers only to Sacramento County alternatives